Project-News

Lifting in of the bridge structure Neuer Poststeg Passau

21.05.2025

Lifting in of the bridge structure Neuer Poststeg Passau

The new bridge also serves as a transport line for the district heating network of Stadtwerke Passau, which is mainly fed by a combined heat and power plant in Bahnhofstraße. In order to be able to withstand future expansions to the supply network, the new pipeline has been laid in DN 300 and equipped with roller bearings on the bridge structure to withstand expansion in the event of temperature fluctuations.

Gammel Engineering is proud to be part of this important and future-oriented project as the planner of the district heating pipeline and we look forward to continuing our good cooperation. Many thanks to our planning partners and the client for the trust they have placed in us.

Gallery

More News

Gammel-Inside

🍏 From the harvest straight into the jar 🍏

Read more
25.08.2025
Gammel-Inside

Our new homepage is online!

Read more
18.08.2025
Press

FUTURE-proof concepts against the energy shock in milk and cheese production

Read more
06.08.2025
Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering