References

Teisendorf Biomasse-Heizwerk Brauerei Wieninger

Description

Tradition meets the future: the private brewery M.C. Wieninger in Teisendorf is replacing its heavy oil boilers with a state-of-the-art biomass steam generation system. Gammel Engineering planned a natural wood-fired boiler system (2.0 t/h) together with a peak load boiler (4.0 t/h) to supply the entire brewing process in a climate-friendly way.

đź”§ Highlights of our solution:

  • Steam utilization for brewing kettle, And heating - consistently sustainable brewing process
  • District heating feed-in even in summer - oil is replaced by wood
  • Flue gasEconomizer for maximum fuel utilization
  • sewage gas power generation in the CHP - waste material becomes energy
  • large buffer storage for flexible load shifting and increased efficiency
  • option for steam engine to generate electricity from biomass steam

đź’ˇ Why Wieninger is a beacon for us:

Here, regenerative energy becomes a top priority - with a well thought-out overall system consisting of biomass, buffer storage, CHP and district heating.

Gammel Engineering is bringing the energy revolution to the brewery - efficiently, economically and with an eye to the future.

Location

Experience and innovation
in every project. *
Contact
â–¸
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark ChammĂĽnster Nord 3
93413 Cham

Careers at Gammel Engineering