As part of a comprehensive project development, Gammel Engineering precisely analyzed the current steam and power requirements of a dairy - taking into account planned plant expansions and future load profiles.

The aim was to set up heat and power generation in an energy-efficient and sustainable manner. A high-performance concept for self-supply was developed on the basis of detailed simulation calculations and profitability analyses.

🔧 Core components of the analysis:

  • Steam generation concept:
  • Design of a modern 4-pass steam boiler with an output of 12 t/h to supply the process steam requirements
  • CHP variant comparison for in-house power generation:
    • Gas turbine + steam boiler (with waste heat function)
    • CHP + steam boiler combination
    • Direct-fired steam boiler with downstream steam engine expansion machine
  • Evaluation:
  • Comparison of the variants in terms of efficiency, CO₂ savings, investment and operating costs and eligibility

📊 result & benefit:

  • An ecologically and economically coordinated system design that serves as a basis for decision-making for realization
  • Significant increase in energy efficiency and reduction of external electricity and fuel purchases
  • Consideration of flexibility for future growth and expansion of production facilities

🌱 Fazit:

With the intelligently planned combination of combined heat and power and efficient steam generation, Gammel Engineering has created a future-proof energy solution for demanding food production.

Steam, electricity and efficiency - perfectly harmonized

Location

Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering