Project-News

Vivantes Hospital Berlin

22.03.2022

Vivantes Hospital Berlin

A CHP unit and two peak load boilers provide the heat in the buildings; the CSSD has been converted to Thermal oil heat, supplied by two new boilers. All of the new burners can be be operated with natural gas or heating oil. A particular challenge: the new generation systems had to be integrated into the existing boiler house during ongoing operations. "We knew that Vivantes was primarily looking for an engineering company that had special experience with thermal oil Thermal oil. So we were all the more pleased that we were able to realize this project."

More News

Gammel-Inside

Our new homepage is online!

Read more
18.08.2025
Press

FUTURE-proof concepts against the energy shock in milk and cheese production

Read more
06.08.2025
Gammel-Inside

Congratulations, dear Tom!

Read more
31.07.2025
Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering