Strike time in Regensburg - Our 2026 sports trip
In 2026, it was once again time to knock over pins, collect points and have lots of fun!
Following the withdrawal of previous partner Silenos Energy GmbH, the municipality has taken over all shares in the geothermal company. The project is now being implemented in close cooperation with Fernwärmenetz Gräfelfing GmbH (FWNG).
As the partner responsible for planning the entire district heating network in the municipal area, Gammel Engineering is contributing comprehensive expertise and future-oriented engineering. Gammel has already successfully completed the planning up to service phase 4 - and we are currently pushing ahead with the implementation planning of the pipeline networks at full speed.
Our goal: a secure, efficient and sustainable heat supply for the whole of Gräfelfing.
Gammel Engineering is proud to be playing a key role in shaping this important project. It is more than just an infrastructure project - it is an active contribution to the energy transition. We would like to thank the municipality of Gräfelfing for their trust and look forward to the next steps towards a low-emission, future-proof heat supply.
Find the full article here:
In 2026, it was once again time to knock over pins, collect points and have lots of fun!
The official blessing of the new children's center in Regensburg took place on 13.03.2026. A significant step in the further development of medical care for children in the region. The St. Martin Children's Center now offers state-of-the-art new facilities for the treatment and care of young patients with physical and mental disabilities.
A healthy diet is a crucial building block for well-being, performance and long-term health. For this reason, nutritional advice was offered at GE as part of occupational health management (OHM), initiated by Evi Wittmann, who is responsible for OHM at the company.