Gammel Engineering at the leading trade fair "Energy" at HANNOVER MESSE 2015
13.04.2015
Gammel Engineering at the leading trade fair "Energy" at HANNOVER MESSE 2015
We cordially invite you to visit us at the Hannover Messe and learn more about the challenges and latest developments in environmental technology & resource efficiency.
At the joint "Bayern Innovativ" stand in Hall 13, Stand C26, Gammel Engineering will be presenting itself to a wide audience from industry and business and will also be showing solutions for your company on the following topics:
- Combined heat and power generation and combined cooling, heat and power generation
via gas engine and gas turbine power plants
- Waste heat utilization (heat refinement) through electricity generation
or heat network
- fuel-flexible, modular and growing decentralized energy systems
Energy systems
As an independent engineering service provider, we want to sharpen your senses for sustainably optimized energy efficiency and calculable energy costs. Find out more about our decentralized energy systems. Incidentally, our Kombi Power System® - the efficiency, emissions and technology benchmark - was awarded the Bavarian Energy Prize 2014.
We look forward to welcoming you to the trade fair in Hanover.
Gallery
More News
News
Digitalization Committee of the Regensburg Chamber of Industry and Commerce for the Upper Palatinate / Kelheim
Harnessing the Potential of AI in a Responsible Manner.
At the Regensburg Chamber of Industry and Commerce’s Digitalization Committee, Thomas Winkler (Gammel Engineering) and Christian Wittmann (Wittmann EDV-Systeme) discussed how AI-supported knowledge management aids project work.
On October 13, 2026, we were pleased to welcome Ms. Annette Bauer, coordinator, and Ms. Anna Portner, president of the hospice association, to our facility. As part of our Gammel Family Social Fund, we presented them with a donation of 850 euros.
Groundbreaking Ceremony for the New Cabrini School Building
A forward-looking construction project will begin in Offenstetten with a ceremonial groundbreaking on October 2, 2026. A modern building complex for approximately 220 children and adolescents will be built in two phases.