20 years at Gammel Engineering - congratulations Tom!
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
The aluminum smelting plant at the BMW site in Landshut is being expanded to include a heat recovery system in order to use the exhaust gases from the smelting plant more efficiently. The waste heat recovery concept for this comes from Gammel Engineering. The excess heat from the melting furnaces is fed into the plant's internal hot water network. Process cooling is generated via two absorption chillers with a total cooling capacity of approx. 2.0 MW and fed into the cold water network
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
The Verein zur Förderung krebskranker und körperbehinderter Kinder Ostbayern (VKKK) supports children and young people with cancer and their families with care, financial assistance and practical support.
Gammel Engineering worked with the customer to plan and technically implement an emergency steam boiler system in order to secure the process-side steam supply of chemical and special materials producer Nabaltec AG in the long term.