Description
As the world's leading manufacturer of system formwork and scaffolding, PERI has massively expanded its production capacities at the Weißenhorn site - accompanied by a modern, central energy center for heat and compressed air generation for the entire plant.
🔧 Highlights of our solution:
- Two injection firing systems, each with 5,3 MW firing capacity each - fed with wood chips from production
- Thermal oil circuit (315 °C flow) for heating the powder coating and an ORC system for combined power and heat generation
- Utilization of the ORC waste heat for offices, Halls and neighboring residential buildings via a branched district heating network
- Centralized utilization of production waste - economical, low-emission, trend-setting
💡 Why this project sets standards:
The fully integrated energy solution combines industrial production, process heat and site supply - with consistent use of its own resources and maximum energy efficiency.