References

Stephansposching Anbindung Goldsteig Käsereien an die Dampfversorgung der Papierfabrik von UPM

Description

In 2017, Goldsteig Käsereien Bayerwald GmbH made a conscious decision not to install its own boiler system and commissioned Gammel Engineering with an innovative solution: connection to the steam supply of the neighboring UPM paper mill via an intelligent remote steam network

🔧 Technical highlights:

  • 500 kg/h pure steam generator & Heating condenser that converts steam into process-compatible pure steam and 95 °C heat
  • Double-insulated plastic jacket pipes with special moisture and leakage monitoring prevent heat loss - even with pressure drop from 3.2 to 2.5 bar
  • Heat exchanger with large surface area compensates for pressure drop and ensures high efficiency

🌱 Efficiency & Sustainability:

  • CO₂ reduction of approx. 30%, by using excess waste heat from the paper mill instead of fossil fuels
  • Fully integrated measurement, control and regulation technology, implemented in four construction phases

💡 Why the project is a Gammel showcase project:

  • Win-win for the environment and economic efficiency - no new heating system, but climate-friendly steam from a regional source
  • Engineering expertise: technically sophisticated routing, leakage monitoring and pressure optimization require precise planning
  • Partnership-based implementation: intensively coordinated planning between the dairy, paper mill and energy supplier

Location

Gallery

Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering