Description
For SMP Automotive Exterior GmbH, a state-of-the-art production site is being built in Schierling for the manufacture of complete exterior components - including bumpers and sill linings for the international automotive industry. With an investment volume of around EUR 100 million, the project sets new standards in energy efficiency, supply integration and production logistics.
As part of an integral planning process, a tailor-made supply system was implemented together with architects, plant structure planners and process developers, which provides all forms of energy as required - including systematic use of waste heat.
đź”§ Our services at a glance:
- Overall planning of all technical building services:
- Water supply and disposal, external sewage network
- Process heat and process cooling supply at several temperature levels
- Fire extinguishing technology, compressed air, technical gases
- medium-voltage and low-voltage technology (20 kV)
- energy center:
- 4 MW thermal firing capacity
- 4 MW cooling capacity
- 7 MW electrical connected load
🌱 Technology with a future:
- Integrated media supply from a single source - perfectly matched to process chains & Production logistics
- Energy efficiency through heat recovery and waste heat recovery
- System design with high availability and redundancy - for maximum operational reliability
- Planning of infrastructure and networks with future expansions provided for scalability
đź’ˇ Why Schierling is a Gammel lighthouse project:
- We deliver technical architecture for industrial efficiency - modular, reliable and future-proof
- Energy, water, cooling, compressed air, safety - all from one well thought-out source
- Customized supply for 24/7 manufacturing at world market level