Polen - Jeleniow Biomasse-HKW Stelmet

Description

For Stelmet S.A., Europe's third largest manufacturer of pressure-impregnated garden timber, we have planned and implemented a powerful ORC biomass cogeneration plant in Jeleniów. The plant uses the sawdust produced in the factory - automatically conveyed, dried via belt dryers with 10 MW + 7 MW - before it is fed to the pellet presses.

🔧 Our technical solution:

  • Biomass boilers with 2×5.7 MW + 10 MW thermal output supply process heat and heat thermal oil for ORC power generation (1.6 MW electric). All waste heat is then fed into a 20 MW hot water network - for drying and production heat.
  • Comprehensive planning of the energy chain: from automatic chip logistics and thermal processes to the ORC turbine and return to the heating network.
  • TGA and approval planning, including I&C architecture, safety concepts and plant interfaces - technically precise and legally robust.

💡 What makes the project strong:

  • Resource-saving use of production waste - full circular economy in the plant.
  • Double energy use - heat for production + electricity into the grid: maximum efficiency.
  • Future-proof remuneration security thanks to EEG-compliant electricity production.
  • Overall technical integration - we deliver the solution that combines productivity and energy efficiency.

Conclusion: With the ORC power plant at Stelmet, we show how industry and energy technology can merge perfectly: sustainable, innovative and loaded with expertise. Gammel Engineering - we rethink energy - and build solutions that work.

Location

Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering