Description
After a comprehensive feasibility study on the general refurbishment of the existing school buildings, the Oettingen school association decided on a future-oriented replacement building.
Gammel Engineering GmbH was commissioned with a feasibility study on energy supply at an early stage. As part of this, various supply concepts were analyzed. Gammel Engineering was then awarded the planning contract for the technical building equipment (TGA).
🔥 Heat is supplied to the school via a district heating connection. The energy required is generated in an environmentally friendly and CO₂-neutral way via a biogas cogeneration plant.