For Stadtwerke Landshut, we are planning a state-of-the-art peak load and reserve heating plant that will reliably secure the existing district heating network in future. We are constructing the central energy infrastructure in a new technical building, including:
- Two gas boilers with 6.5 MW output each
- A third gas boiler with 2 MW
- Complete electrical and I&C equipment for demand-based control
🔧 Our range of services:
- Plant engineering & building structure: Planning of new boiler house construction, boiler installation, pipe and media routing
- District heating transfer & pressure systems: Dimensioning of piping, design of pressure maintenance and make-up
- Medium-voltage connection: Integration of the electrical infrastructure for operation, control, pumps and MSR
- MSR integration into the control system: Control of the boiler technology and integration into the central remote control network of Stadtwerke Landshut
💡 Why the project matters:
- Secure supply for Landshut - robustly designed peak load technology for winter challenges and failure protection
- Comprehensive building services engineering - construction, hydraulics, power supply and control from a single source
- Flexible & modular - prepared for future expansions, higher performance requirements or alternative fuels
- Efficient operation management - modern I&C concept for automated, economical operation
Conclusion: With this heating plant project, we are building an efficient, safe backbone solution for Stadtwerke Landshut - energy-efficient, reliable and future-oriented. Gammel Engineering delivers technical clarity, sustainability and reliability - a perfect fit for your heating infrastructure.