Holzkirchen Fernwärmenetz der Gemeindewerke

Description

The Holzkirchen municipal utilities are pressing ahead with their municipal geothermal project: up to 80% of their heating requirements are to be covered by their existing district heating network of almost 25 km in length. We were commissioned with the planning - specifically with:

  • Hydraulic connection of the geothermal heating center to the existing district heating network
  • Design of the pipeline routes, including pressure and heat loss calculation
  • Dimensioning of the heating center & Network pumps, including pressure maintenance and make-up
  • Connection of the three existing heat islands, hydraulic and control technology

Our work ensures that deep geothermal energy is provided smoothly, efficiently and safely. The foundations have been laid for a long-term climate-friendly system.

💡 Why we shine here:

  • Systematic in-depth view: From borehole to heating distributor - we design energy flows intelligently
  • Detailed analysis & grid moderation: Our calculation ensures technically clean grid expansion
  • Control of heat islands: We network existing infrastructures to create a flexible overall system
  • Planned for the future: The foundation is laid for sustainable heat generation and smart expansion

Conclusion: We show how geothermal energy can succeed on site - technically well thought-out, operationally safe and integrable into existing grids. Gammel Engineering delivers systemic engineering for the energy supply of the future!

Location

Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering