Description
We have significantly modernized the energy supply for the Federal Mogul GmbH plant in Friedberg. in 2014/2015, we transformed the existing hot water infrastructure into an efficient low-temperature hot water system (95 °C / 65 °C). The special feature of our concept: in addition to the basic supply, we integrated the process heat for electroplating baths (side wall and running surface chrome plating of the piston rings) into the system. For this purpose, systems in energy centers 27 and 7E were technically prepared and connected to the electroplating facilities in buildings 05-07.
Our services at a glance:
- 💡 System conversion with effect: Conversion from hot water to low-temperature operation - less losses, more efficiency.
- 🔧 Process integration: Electroplating baths adapted for hot water operation instead of electric heating - tailor-made and precisely implemented.
- 🛠 Hydraulically precise planning: Line routing, pressure-side adjustments and heat dissipation precisely tailored to the electroplating requirements.
- 🌱 Future-oriented energy system: Foundation created for later integration of CHP, cooling or heat distribution solutions.