Friedberg Umbau der Energiezentrale bei Federal Mogul

Description

For the global automotive supplier Federal Mogul in Friedberg, we modernized the entire energy center and designed it to meet the requirements of efficient, flexible supply. The focus was on replacing old hot water boilers: instead, we installed powerful hot water boilers with a thermal output of 4 MW each - designed for a system-wide temperature regime of 95 °C flow / 65 °C return.

To ensure maximum flexibility, we relied on dual-fuel burners, which enable precise adjustment to current energy prices. We have already considered and implemented all the necessary preparatory installations in good time for future expansions - in particular the later integration of our own cogeneration unit and an absorption chiller.

  • Modernization at the highest level - two powerful hot water boilers replace the old systems, reduce losses and increase efficiency.
  • Flexibility through technology - dual-fuel burners enable dynamic fuel selection according to price and availability.
  • Modular future-proofing - infrastructure prepared for CHP and cooling coupling - as planned, but not yet installed.
  • All-round thinking - we not only deliver a solution for today, but create the foundation for tomorrow.

Location

Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering