Description
Pellmeyer GmbH & Co KG operates the extensive district heating network in Allershausen. The network has around 30 connections and supplies around 40 consumers. The waste heat from the biogas CHP units covers the base load. The peak load is covered by a wood-fired boiler.
Gammel Engineering was commissioned with the hydraulic calculation of the network using the Stanet calculation program. After creating the network model in the existing system, various variants and scenarios, including a ring line and line optimization, were numerically examined to relieve the load on a section of the line. The possibility of connecting new consumers was also examined using the simulation.