20 years at Gammel Engineering - congratulations Tom!
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
A total of 3 stainless steel external air towers each with a diameter of 1200 mm were installed. At 9.6 m, 8.8 m and 8.0 m, the heights of the towers were adapted to the height of the shed roof to create a visually continuous line. The design air volume per tower is 8,325 m³/h, i.e. a total of 25,000 m³/h.
The "Gammel Engineering family" is delighted and proud to be able to actively support this project with our expertise.
We put our heart and soul into our work!
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
The Verein zur Förderung krebskranker und körperbehinderter Kinder Ostbayern (VKKK) supports children and young people with cancer and their families with care, financial assistance and practical support.
Gammel Engineering worked with the customer to plan and technically implement an emergency steam boiler system in order to secure the process-side steam supply of chemical and special materials producer Nabaltec AG in the long term.