20 years at Gammel Engineering - congratulations Tom!
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
On 16.04.2014, the ORC module is delivered and positioned at its installation site. The ORC system is the second power generation stage after the modified gas turbine. This gives Naturenergie Hersbruck the world's first GuORC system for the combined generation of electricity and heat from natural biomass. The integration into the existing plant is being prepared and will be completed in the week after Easter.
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
The Verein zur Förderung krebskranker und körperbehinderter Kinder Ostbayern (VKKK) supports children and young people with cancer and their families with care, financial assistance and practical support.
Gammel Engineering worked with the customer to plan and technically implement an emergency steam boiler system in order to secure the process-side steam supply of chemical and special materials producer Nabaltec AG in the long term.