It's running: The Kombi Power System at Arcobräu generates electricity
14.06.2013
It's running: The Kombi Power System at Arcobräu generates electricity
Since Thursday, June 14, 2013 - 4:00 pm, the turbine of the biomass power plant at the traditional brewery Arcobräu has been running and generating electricity. With the Kombi Power System from Gammel Engineering, Arcobräu Gräfliches Brauhaus GmbH & Co KG is making itself independent of the general power supply and relying on a decentralized energy supply from renewable resources.
This combined power system supplies steam as well as electricity and provides the surrounding area with district heating. The brewery uses the steam to generate the heat needed to brew beer. The district heating is in operation and is already supplying the first properties.Now the final adjustments are being made to ensure that the biomass power plant constantly delivers its output of 225 kWel. The combined power system at Arcobräu is operated with wood chips, bark and landscape conservation wood.The Kombi Power System from Gammel Engineering is the new generation of decentralized energy generation. It is a leader in terms of efficiency and emission values. The Kombi Power System is modularly constructed according to individual requirements and enables gradual upgrading and expansion at any time. The Kombi Power System can generate electricity, cooling or heating, warm and hot water, low-pressure and high-pressure steam, hot thermal oil and hot air.
Barbecue Party at Gammel Engineering: A Summer Evening Full of Team Spirit, Music, and Soccer Fever
Yesterday, we held this year’s barbecue in the Gammel Engineering garden—a thoroughly enjoyable evening in a relaxed atmosphere that once again demonstrated what sets our team spirit apart.
There are dates on the calendar that are more than just an event. The REWAG Company Run is exactly that kind of moment: an evening that isn’t about kilometers, times, or bib numbers, but about community, energy, and the great feeling of sharing an experience together.
Blessing and Dedication Ceremony for the New Residence of the Brothers of Mercy in Taufkirchen
A new residential facility operated by the Barmherzige Brüder's disability services was inaugurated at Rosenstraße 25 in Taufkirchen. Twenty-four people with disabilities have found a new home in the new facility.