20 years at Gammel Engineering - congratulations Tom!
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
The pot contains wood chips, which are heated to produce pyrolysis gas. This pyrolysis gas is burned absolutely cleanly. The energy generated during combustion is used to drive the turbine. Thanks to this process, the Kombi Power systems from Gammel Engineering are leaders in terms of emission values:
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
The Verein zur Förderung krebskranker und körperbehinderter Kinder Ostbayern (VKKK) supports children and young people with cancer and their families with care, financial assistance and practical support.
Gammel Engineering worked with the customer to plan and technically implement an emergency steam boiler system in order to secure the process-side steam supply of chemical and special materials producer Nabaltec AG in the long term.