Press

Factory set up for the future

01.02.2017

Factory set up for the future

Gammel Engineering was commissioned with the planning of the technical building equipment for this project.

Read the report here in the

IHK Wirtschaft Konkret 02/2017

More News

Gammel-Inside

Our new homepage is online!

Read more
18.08.2025
Press

FUTURE-proof concepts against the energy shock in milk and cheese production

Read more
06.08.2025
Gammel-Inside

Congratulations, dear Tom!

Read more
31.07.2025
Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering