Strike time in Regensburg - Our 2026 sports trip
In 2026, it was once again time to knock over pins, collect points and have lots of fun!
A natural gas CHP unit with 2 MWel and 2 MW waste heat as well as an absorption chiller (AKM) with 750 kW cooling capacity are installed in the new energy center in the middle of the industrial plant. The CHP covers the electrical base load (approx. 50 %). The site produces 380 million light bulbs in 3 shifts throughout the year. The waste heat is fed into the existing heating network and covers approx. 90 % of the heating requirements. The CHP also supplies an absorption chiller. A new 13/19 °C cooling network will be installed throughout the entire facility. The centrally generated cooling is intended to cover the base load of the 32 compression chillers distributed throughout the plant.
In 2026, it was once again time to knock over pins, collect points and have lots of fun!
The official blessing of the new children's center in Regensburg took place on 13.03.2026. A significant step in the further development of medical care for children in the region. The St. Martin Children's Center now offers state-of-the-art new facilities for the treatment and care of young patients with physical and mental disabilities.
A healthy diet is a crucial building block for well-being, performance and long-term health. For this reason, nutritional advice was offered at GE as part of occupational health management (OHM), initiated by Evi Wittmann, who is responsible for OHM at the company.