20 years at Gammel Engineering - congratulations Tom!
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
Gammel Engineering is proud that we were able to plan and support the project in service phases 2 to 8. The entire building is supplied with heating and cooling via two reversible heat pumps. At the same time, the office and development rooms are supplied with fresh air via 4 ventilation systems.
We would like to thank our planning partners and the client for their excellent and constructive collaboration and are delighted to share this special award with them!
A special anniversary was celebrated today at our Cham branch: Thomas Zweier looks back on 20 years at Gammel Engineering.
The Verein zur Förderung krebskranker und körperbehinderter Kinder Ostbayern (VKKK) supports children and young people with cancer and their families with care, financial assistance and practical support.
Gammel Engineering worked with the customer to plan and technically implement an emergency steam boiler system in order to secure the process-side steam supply of chemical and special materials producer Nabaltec AG in the long term.