Strike time in Regensburg - Our 2026 sports trip
In 2026, it was once again time to knock over pins, collect points and have lots of fun!
The project was planned and supported by us in service phases 2 to 8. The entire building is supplied with heating and cooling via two reversible heat pumps. At the same time, the office and development rooms are supplied with fresh air via 4 ventilation systems. Thanks to the excellent collaboration with Vollack, we are currently well on schedule and will be able to hand over the building on time in September 2024.
You can read here in the Architekturblatt article
about how the Scheugenpflug company is setting an example for climate protection with its intelligent energy conceptGammel Engineering is delighted with the trust placed in it by its planning partners and looks forward to continuing its constructive collaboration.
In 2026, it was once again time to knock over pins, collect points and have lots of fun!
The official blessing of the new children's center in Regensburg took place on 13.03.2026. A significant step in the further development of medical care for children in the region. The St. Martin Children's Center now offers state-of-the-art new facilities for the treatment and care of young patients with physical and mental disabilities.
A healthy diet is a crucial building block for well-being, performance and long-term health. For this reason, nutritional advice was offered at GE as part of occupational health management (OHM), initiated by Evi Wittmann, who is responsible for OHM at the company.