Gammel Engineering puts innovative "iCube" UPS storage system into operation
02.08.2017
Gammel Engineering puts innovative "iCube" UPS storage system into operation
With iCube our energy model is complete: energy-saving devices, in-house power generation with CHP and PV, server room cooling with Adsober to use the CHP heat in summer too, power storage, mobility charging stations and optimum coordination using state-of-the-art control technology. Decentralized energy efficiency practice for us and our customers.
There are now numerous energy storage systems on the market - however, most of these do not function without interruption in the event of a power outage or cannot absorb self-generated CHP electricity (AC). With iCube, companies do not need an additional uninterruptible power supply (UPS) for important consumers such as the server room. With the iCube, energy storage and power electronics save energy costs every day instead of waiting for their emergency use without adding value.
The innovation at Gammel Engineering is the combination of UPS and storage system, so that the costs for decentralized UPS are eliminated and the building is secured. Another new feature is that the solar system and CHP units can continue to run without interruption even in the event of a power failure and increase the battery backup time or even recharge the battery in the event of a surplus.
The system is based on the latest LiIon technology, which allows a high charging capacity of the battery.
Call us - our energy saves your resources!
More News
Gammel-Inside
We were there - CONNECTA Regensburg 2025!
CONNECTA in Regensburg is the largest company contact fair in Bavaria and has established itself as an important meeting point between business, social institutions and students. Every year, numerous companies looking for motivated young talent present themselves there - and we were proud to be one of them!
BGM with a system - proven methods and instruments
3. Workshop of the 5-part seminar series at Gammel Engineering
As part of our seminar series "Systematic occupational health management - proven methods and tools", the third workshop took place yesterday with great success. Under the expert guidance of Dr. Martin Simmel and Ms. Barbara Mayrhofer, this time everything revolved around the topic of psychological risk assessment - a central component of occupational health management (OHM).
After around one and a half years of construction, the "Hummelchen" short-term care facility run by Katholische Jugendfürsorge (KJF) Regensburg has opened its doors. Here, children and young people with severe disabilities will find a loving temporary home - and their families valuable relief.
Gammel Engineering was involved in this special project as a planning partner for heating, ventilation and sanitation and is delighted to have contributed to this place of well-being with its technical expertise.